Type:Borage Seed extract
Form:Oil
Part:Seed
Extraction Type:Cold Pressed
Packaging:bottle, CAN, Drum, Glass Container, Plastic Container
Place of Origin:Liaoning, China
Grade:Food Grade
Brand Name:Sanmark
Model Number:Conventional
Certificate:ISO, Organic, GMP, HALAL, KOSHER, IP
Usage:Cooking, healthcare
Storage:Cool and dry place
OEM/ODM:Available
Appearance:Clear, light yellow or yellow liquid
Sample:Available
MOQ:25kg
Shelf Life:2 years if unopened
Product Name:Borage oil
Content:GLA 18%-24%Suitable for sunflower seeds, rapeseed, oleander, soybean, tea seed, pepper seed, sesame, peanut.This oil press machine is suitable for rapeseed, peanut, soybean, sunflower, rapeseed, sesame seed, tea seed, walnut, corn germ,etc.The flow chart process of palm oil processing machine
Palm fruit bunches–Sterilizing–Threshing–Digesting–Pressing–Clarifying–Filtering–Drying–Crude palm oil.1. Energy Saving:The electric power can be reduced by 40% under the same output. For example, the machine can save 6 kilowatt at an average of one hour. In that case, it could save about 30 RMB per day.
2. Labor Saving:60% labor can be saved under the same output. One or two person can organize the production. It can save about 40 RMB of labor cost every day.
3. Widely Usage:The machine is multi-function. It can process more than 20 kinds of oil crops, such as, peanut, linseed, sesame,rapeseeds, sunflower, cottonseeds, soybean, etc.
4. Oil Pure:Vaccum filter can filter the residue and ensure the oil quality. The oil can meet the standard of health quarantine.
5. Small Area Covering: 10 ~ 20 m2can meet the production needs.

Oil Seeds Oil Extraction Rate(%) Dry Cake Residual Oil Rate(%)
Sesame 42-55 ≤7
Rape Seed 28-38 ≤8
Sunflower 30-38 ≤8
Peanut 40-50 ≤8
Soybean 10-16 ≤7

Our company have different machine suitable for all kinds of oil seeds, eg: sunflower seed, soybean, sesame, rapeseed, peanut, cotton seed, corn germ, walnut, almond, castor seed etc.Our company always put the interests and quality of its clients first, insists the principle that there is no best but only better service. We will commit to provide quality products and improve on-site service and service after selling. Specific commitments are now as follows:
We will organize an experienced engineering team, managed by the Project Manager.
Ensure high-quality materials, excellent service provided to the user;
During the installation process, we will appoint a technical and installation supervision services at the scene.
We do debugging of stand-alone equipment and on-line debugging and commissioning test run to ensure normal operation of the project at full load conditions.
Supply the technical of your staff to ensure training of personnel to operate independently for free.
To ensure that once installation acceptance;
Within one month, to provide customers with qualified acceptance after completion of archive.
To ensure timely provision of equipment and accessories;
We have developed new products, new technology, will give priority to customers;
In the equipment’s warranty period (within 12 months of the date of commissioning qualified):
Due to the quality of the equipment itself damage, we will repair or replace parts.
Damage due to customer reasons, only charge the material cost for repair or replacement by the buyer. After the customer informed our company, we will put forward a propose within 24 hours, using the fastest way to resolve the issue the required components.
We are willing to supply good service on your business development.A : Manufactured strictly based on national and international standard, and we take a test on every equipment before delivery.
5.Q:Can you install the machine in local place?
A: Yes, engineers can be dispatched to your local place for installation and commissioning, also provide operation training.
6.Q: What’s the payment terms?
A:T/T,Trade Assurance,Western Union, MoneyGram,L/C, Cash etc.